Our Products

Equipment & Consumables Distribution List

Simplifying Ultimate Blasting Sophistication

DRILLING

GROUND ENGAGEMENT TOOLS (GET)



DTH Drill Bits & Top Hammer Bits

Size: 89mm,102mm, 115mm, 127mm, 152mm and 171mm
Life: 300m – 500m depending on various rock formation and treatment






Tricone Bits

Size: 165, 171mm, 251mm and 311mm
Life: 300m – 1500m depending on various rock formation and treatment


DTH Hammer & Top Hammer

Size: 4”, 5”, and 6”
Life: 5000m depending on various rock formation


Drill Rods

Size: 4”, 5”, and 6”
Life: 5000m depending on various rock formation

COMMERCIAL

EXPLOSIVES & ACCESSORIES


BOOSTERS

Properties

  • Components: TNT/RDX (60/40)
  • Unit Weight: 150g, 400g & 800g
  • VOD: ³7000m/s
  • Density: 1.6g/cm3
  • Sensitivity: 100% initiated by No. 8 detonator and 8g detonating cord
  • Water proof: Immersing in water for 24 hours   under 0.7MPa, 100% initiated by No.8 detonator and 8g/m detonating cord.
  • Shell: Plastic Catridge
  • Shelf Life: 5 years
  • Case dimension: 35×5×14.5 cm

DETONATING CORD

Properties

  • Core Load: 3.6, 5, 8, 10 &12g/m
  • Shell outside diameter: 6mm
  • VOD: >6000m/s
  • Tensile resistance: >400N
  • Sensitivity: The cord can detonate completely through varieties of connecting union such as over-lapping or reef knot of the cords.
  • Water-proof property: The detonation transmitting ability remains reliable after immersing in 5meter water or water tank with a water pressure of 50   KPa for 5 hours.
  • Temperature range: Detonating property remains reliable after   conditioning at 50±2℃ for 6 hours and at -40± 2 ℃for 2 hours.

ELECTRONIC DETONATORS

Properties

  • Shell material: Aluminum
  • Shell length: 50-90 mm
  • Shell outside diameter: 7.35 mm
  • Legwire material: copper
  • Legwire diameter: 0.5 or 0.6 mm
  • Legwire length: 2m (or as per user’s requirement)
  • Safe current: Connected with 0.20A constant D.C. current for 5   minutes, is shall not explode.
  • Firing current: 0.45A for single piece.
  • Series detonating current: When 20 detonators are connected in series with 1.2A   constant D.C. current, all 20 detonators shall explode.
  • Vibration resistance: Vibrated with a frequency of 1Hz at a height of   150mm for duration of 10 minutes, it shall not explode or become damaged in   its structure.

SHOCKTUBE DELAY DETONATORS

Properties

  • Trunkline
  • Primadet
  • EZ Det

EXPLOSIVES STORAGE MAGAZINE


TECHNICAL EQUIPMENTS

REMOTE FIRING SYSTEM

  • 1670 Remote Firing System
  • 1673 Remote Firing System

1670 CONTROLLER

REMOTE FIRING SYSTEM

1670 Remote Firing System

Description

1670 Remote Firing System with:
1 x Controller Unit
Charges
Initiators

1 x Dual Output Remotes
2 x Antennas
Initiator Keys

2 x Battery
1 x Shock Tube

1670 DUAL REMOTE 1WATT

1670 Remote Firing System with:

1 x Controller Unit
Chargers
Initiators

2 x Dual Output Remotes
2 x Antennas
Initiator Keys

3 x Battery Charges
2 x Shock Tube

1670 Remote Firing System with:

1 x Controller Unit
4 x Antennas

3 x Dual Output Remotes
3 x Shock Tube Initiators

4 x Battery Charges
Initiator Keys

Description
1674 Remote Firing System with:
1 x Controller Unit
Charges
Initiators

1 x Dual Output Remotes
2 x Antennas
Initiator Keys

2 x Battery
2 x Shock Tube

1674 Remote Firing System with:
1 x Controller Unit
Charges
Initiators

2 x Dual Output Remotes
3 x Antennas
Initiator Keys

3 x Battery
3 x Shock Tube


REMOTE FIRING SYSTEM CONSUMABLES

Magnetic Mount Antennas

Description
Magnetic Mount Antenna 1670-674
Magnetic Mount Antenna – 1673

Rubber Duckie Antennas

Description
Rubber Duckie Antenna – 1670
Rubber Duckie Antenna – 1673
Rubber Duckie Antenna – 1674

Low-Profile Shock Tube Tip

Description
Low Profile Shock Tube Tip

Test Lamp Assembly

Description
Test Lamp Assembly

Automotive DC Adapter

Description
Automotive DC Adapter – 1670

WEATHER STATION

Weather Station:

Wireless Vintage Pro 2 ISS Weather Link V-Pro Software Serial Data Logger

Weather Station:

Wireless Vintage Pro 2 ISS Weather Link V-Pro Software Serial Data Logger Mount Bracket Solar Radiation Solar Radiation & UV Sensor


CONSUMABLES

PRE-SPLIT BAGS

PRE-SPLIT BAG – SMALL DIAMETER

Description

Pre-split Tube – 150mm (95mmD) x 5 meter, for 127 – 171mm D Holes complete with anchoring stick and booster insert cord, Charge capacity 45kg (10/Roll)

PRE-SPLIT BAG –  LARGE DIAMETER

Description

Pre-split Tube – 200mm (127mmD) x 3 meter, for 152 – 250mm D Holes complete with anchoring stick and booster insert cord, Charge capacity 45kg (20/Roll)

Pre-split Tube – 200mm (127mmD) x 4 meter, for 152 – 250mm D Holes complete with anchoring stick and booster insert cord, Charge capacity 60kg (20/Roll)

Pre-split Tube – 200mm (127mmD) x 6 meter, for 152 – 250mm D Holes complete with anchoring stick and booster insert cord, Charge capacity 90kg (20/Roll)

Pre-split Tube – 200mm (127mmD) x 10 meter, for 152 – 250mm D Holes complete with anchoring stick and booster insert cord, Charge capacity 150kg (10/Roll)

Pre-split Tube – 300mm (190mmD) x 8 meter, for 152 – 250mm D Holes complete with anchoring stick and booster insert cord (10/Roll)

 

MINER’S SKI ROPE

BLACK HOLE MARKER

Description

Blast Hole Marker 250 per bag – 150mm x 150mm display size x 450mm long.

Available colours: red, white, yellow, and blue

 

Business Contacts

Gauteng:

No 12 Mount Blackburn Street, Midlands Estate, Midstream, 1692

Northern Cape:

No 8425, Bontleng Street, Uitkoms, Kathu, 8446



POSTAL ADDRESS
PostNet Suit 10 · Private Bag x 508 · Kathu – 8446
E-MAIL ADDRESS
techservems@icloud.com

PHONE

+27 73 141 9214+27 64 588 8407