CONTRACT MINING: DRILL & BLAST

TechServe Mining Services is in to the concept of contract drill and blasting services and is aspired to be recognised as the leader in this field, offering the following services:

Drilling & Blasting Services

TechServe Mining Services is in to the concept of contract drill and blasting services and is aspired to be recognised as the leader in this field, offering the following services:

  Blastholes Drilling

  Charging, Timing and Blasting

  Rock on Ground contracts (Comprehensive Drill & Blast)

Drilling & Blasting Technical Support Services

TechServe Mining Services is uniquely positioned to offer a comprehensive range of technical services to support its drill and blasting services. Our services offered to the industry includes:

  • Drill & Blast Design
  • Drill & Blast Audit
  • Blast Monitoring
  • Explosives Product Quality Assessment & Assurance
  • Field Explosives Testing & Comparison
  • Mine to Mill Optimisation Projects
  • Blast Investigation
  • Blasting Impact Assessment
  • Tailored Drilling & Blasting Technical Training
Drill & Blast Design

TechServe Mining Services are equipped with software’s that produces various production blast optimisation designs and/or specialised blast designs depending on the client’s requirements. The designs include but not limited to:


  Final Highwall Design

  Sensitive Area Design (Vibration, Airblast and flyrock Control)

  Box Cut Blast Design

  Fragmentation Optimisation Design

Drill & Blast Audit

For continuous improvement on blast results, TechServe Mining Services conduct drill and blast audits within the parameters of the blasting procedures or general good practices.

Approved tolerable/ acceptable deviations levels from the blast design is normally approved and provided by the client prior to auditing for compliance levels.

Any obvious deviations from the design are either corrected immediately or escalated for a decision by management before the blast is initiated.

DRILL AND BLAST

AUDIT INCLUDES:

Blast Monitoring

Blast is monitored and results are analysed to optimise the blast designs for improved results.


TechServe Mining Services is equipped to

monitor and analyse the following:

  Fragmentation Analysis and Boulder Count Report

  High Speed Video Recording and Analysis

  Vibration and air-blast monitoring and analysis

  Blast fall out dust analysis

  Face Movement Studies

  Blast hole diameter and inclination measurements (quantify explosives overcharging)

  Blast dust impact monitoring and analysis when blasting close to residential areas

Explosives Product Quality Assessment & Assurance

  Explosive’s Viscosity Measurements

  Explosive’s Gassing Rate

  Explosive’s Density Measurements

  VOD Monitoring and Analysis

Field Explosives Testing & Comparison
To provide Clients

with explosives field performance data to increase the confidence in decision making during adjudication of explosive supply contracts.

Mine to Mill Optimisation Projects

To improve the overall downstream production costs, comprehensive optimisation of the drill and blast with drill and blast results while reducing downstream cost

Blast Investigation

With the vast experience in the opencast drill and blasting including explosives technology, TechServe Mining Services will assist its Clients to determine and understand the causes of undesired blast results in relation to the following:


Blasting Impact Assessment
The Assessment to be conducted provides

an evaluation of the potential air blast overpressure, ground vibration, dust, fumes and flyrock impacts from the proposed blasting operations within the open pit mine on sensitive receptors located nearest to the Site. This will mainly focus on the following:


  Pre – blast survey of residential and/or mine building to determine the structural Integrity

  Blast impact on the ground water resource quality and quantity

  Blast impact assessment on surface water resources quality

  Noise and Fall Out Dust Impact Assessment

Tailored Drilling & Blasting Technical Training
To strengthen safe working practices

and upskill technical ability within our customer’s operations, the following topics are covered:


Business Contacts

Gauteng:

No 12 Mount Blackburn Street, Midlands Estate, Midstream, 1692

Northern Cape:

No 8425, Bontleng Street, Uitkoms, Kathu, 8446



POSTAL ADDRESS
PostNet Suit 10 · Private Bag x 508 · Kathu – 8446
E-MAIL ADDRESS
techservems@icloud.com

PHONE

+27 73 141 9214+27 64 588 8407